button_introduction

button_introduction

Translations (English) of protocols confirming 100% reliability of forecasts of Grigori Grabovoi which he made on the production basis of the operating aviation enterprises without using instrument technologies and only through the application of consciousness technologies.


Forecast of failures and malfunctions of equipment by Grigori Grabovoi


Originals of offered to your attention protocols (in Russian) are located in the 1-St volume of 3-volume edition “The practice of control. The way of salvation” by Grigori Grabovoi



APPROVED APPROVED

Director General Deputy Director General

of Joint Venture "ASKON" of the National Airline

of the Republic of Uzbekistan

__________________ Khamrakulov I.V. _______________ Sumbaev S.M.


" _____ " _____________ 1991 " _______ " ____________ 1991



TEST REPORT No 01/91


of extra sensory perception abilities used by

Grabovoi Grigori Petrovich for prediction of malfunction

and failure of the aircraft for a seven day period

in October and November 1991.


We, the undersigned, the executor of the work Grabovoi G.P. and

the representatives of the Customer - Saulkin V.M. the Chief of

Engineering Information Center of the Aircraft Maintenance Base,

Nemtsov S.V. Chief engineer of Engineering Information Center of the

Aicraft Maintenance Base and engineer of Engineering Information

Center Akhmedov B.H. drew up this Test Report to confirm that

Grabovoi G.P. performed tests in October and November 1991 mentioned

below, using his extra sensory perception abilities. These tests

were performed in conformity with Agreement No.9 of 02.12.1991

concluded between Soviet-American Joint Venture "Askon" and the

Directorate of Civil Aviation of Uzbekistan on the theme

"Nontraditional Methods of Inspecting Aviation Equipment."

In October and November 1991 using his extra sensory

perception abilities Grabovoi G.P. inspected the aircraft IL-62 and

IL-86 of Tashkent Aircraft Maintenance Base.

The aim was to define possible malfunctions which could be

hazardous during flights in future.

Grabovoi G.P. made extra sensory predictions of potential

malfunctions of the aircraft IL-86 from 27.10.1991 to 02.11.1991.

The predictions were given to Akhmedov B.H. Later these predictions

were compared to the records in the flight logbook.


Aircraft IL-86 call sign 86090.

Prediction of Grabovoi G.P.: Malfunction of the unit related

to the engine.


Extract from the flight logbook: "28.10.1991 after starting

all engines operations and switching on the current the

generator 1-power unit doesn't operate, (the display shows

"the generator doesn't work", magnetic recorder- 1 display

shows "out of order": Ugen=0)."


16.11.1991 Grabovoi G.P. gave his prediction of malfunctions

and failures of the aircraft from 16.11.1991 to 23.11.1991.

The prediction was prepared by 12a.m. and was kept by

Akhmedov B.H. The prediction was compared to the records in

the flight logbook.


Grabovoi G.P. made his predictions while at the Aircraft

Maintenance Base, he also approached the planes at 50m distance. He

made predictions for the aicraft with and without passengers on

board. The following results were obtained:



1. Aircraft IL-86 call sign 86052.

Prediction of Grabovoi G.P.: malfunction of aircraft

electric system.


Extract from the flight logbook: "20.11.1991. The

generator of the third and fourth engines does not

operate." (monitor of protection and control ‘Џ 376T is

replaced).


2. Aircraft IL-86 call sign 86064.

Prediction of Grabovoi G.P.: malfunction of the engine

fueling system; interference with the magnetic band of

the recorder.


Extract from the flight logbook: "20.11.1991: crack in

the combustion chamber I-power unit." (The engine is

dismantled before the appointed time.)


Information obtained in the "Analysis-86": "Beginning

from 18.11.1991 the recorder fails to register

vibration."


3. Aircraft IL-86 call sign 86064.


Prediction of Grabovoi G.P.: malfunction of the

electrical equipment related to the generator. Fuel

system failure. Fire preventions measures should be

considered.


Extract from the flight logbook: "5. The technical data

of No.4 idling engine are not in conformity with the

specifications. (Idle speed adjustment of the engine is

made.)


6. Port side left bus 393H (24,5a): high tension of the

continuous current is low. (The break of the wire is

eliminated.)


21.11.1991 At the airport Tashkent: The engine No.1

should be restarted to operate properly.


22.11.1991 Caution indication operates accidentally

showing: "Smoke in the cargo space".


4. Aircraft IL-62 call sign 86679.


Prediction of Grabovoi G.P.: malfunction of board

equipment; failure to lower the landing gear (no

breakdown).


Extract from the flight logbook: "20.11.1991 The right

master gyroscope-10 is slowly coordinated in pitch when

turned on. (the right master gyroscope-10 is replaced)


21.11.1991 retraction/extention does not operate.

(UP-2-2 is replaced)


When the landing gear is extended there is no green

light, showing the end of the cycle. When the landing

gear is retracted and extended again there is green


light, showing the end of the cycle, the yellow lamp is

out and the antiretraction push button comes out."

5. Aircraft IL-62 call sign 86704.


Prediction of Grabovoi G.P.: malfunction of the right

wing equipment of aircraft sensitivity.


Extract from the flight logbook: "17.11.1991. When the

aircraft is controled by bearing distance computer

using the main roll channel of the system of

independent control, right-hand bank turn is not more

than 5-7 (very slowly), left-hand turn is normal."


6. Aircraft IL-62 call sign 86610.


Prediction of Grabovoi G.P.: Malfunction of the

fuelling system of the engine.


Extract from the flight logbook (made after 19.00 p.m.

local time, the prediction was made before 12 p.m. that

day). "16.11.1991 Fuel filter of the 4 power unit is

out of order."


The conclusion made by the specialists of the Engineering

Information Center after comparing the predictions of Grabovoi G.P.

to the extracts in the flight logbook is that the predictions were

correct for all aircraft inspected by him using his extra sensory

perception abilities.



The executor of the work The representatives of the Customer:

Grabovoi G.P.

Saulkin V.M. The Chief of

Engineering Information Center of the

Aircraft Maintenance Base of the

National Airline "Uzbekistan Airways"


Nemtsov S.V. Chief engineer of

Engineering Information Center of

the Aircraft Maintenance Base of the

National Airline "Uzbekistan Airways"


Akhmedov B.H. engineer of

Engineering Information Center of

the Aircraft Maintenance Base of the

National Airline "Uzbekistan Airways"





APPROVED APPROVED

Director General Deputy Director General

of Joint Venture "ASKON" of the National Airline

of the Republic of Uzbekistan

__________________ Khamrakulov I.V. _______________ Sumbaev S.M.


" _____ " _____________ 1991 " _______ " ____________ 1991






TEST REPORT No 03/91


of extra sensory perception abilities used by

Grabovoi Grigori Petrovich for prediction of malfunction

and failure of the aircraft before the test flight 13 November 1991.



We, the undersigned, the executor of the work Grabovoi G.P.

and the representatives of the Customer - Kubrak V.N. the Chief of

Aircraft Test Laboratory of the Aircraft Repair Plant No.243,

Saulkin V.M.- the Chief of Engineering Information Center of the

Aircraft Maintenance Base, Saldin G.N.- Chief Engineer of Aircraft

Test Laboratory of the Aircraft Repair Plant No.243 and Nemtsov S.V.

Chief engineer of Engineering Information Center of the Aicraft

Maintenance Base drew up this Test Report to confirm that Grabovoi

G.P. performed tests in November 1991 mentioned below, using his

extra sensory perception abilities. These tests were performed in

conformity with Agreement No.9 of 02.12.1991 concluded between

Soviet-American Joint Venture "Askon" and the Directorate of Civil

Aviation of Uzbekistan on the theme "Nontraditional Methods of

Inspecting Aviation Equipment."


Under the agreement with the chief specialists of Aircraft

Test Laboratory of the Aircraft Repair Plant No.243, 13 November

1991 Grabovoi G.P. inspected the aircraft IL-62 call sign 86518

using his extra sensory perception abilities, which was prepared for

the test flight.

The aim was to inspect the main systems of the aircraft for

3-5 minutes without using any drawings and to inspect aircraft units

and members and define defective components using the catalogue and

being some distance off the aircraft.


Grabovoi G.P. made extra sensory predictions of potential

malfunctions 2 hours before the flight, and when he was 2km. away

from the aircraft, he named those units which would malfunction.


The prediction of Grabovoi G.P. consisted of two parts. In

the first part he defined the units of the aircraft which would

malfunction:

1. fueling system and its units;

2. electrical equipment;

and those units, which would operate faultlessly:

engines and its units, oiling system and its units, air

system and its units, hydraulic and hydraulic nitrogen

systems and their units, gear, radio communication

installations, cockpit equipment, airframe, aircraft

recorders.


In the second part Grabovoi G.P. named the components and

assemblies related to predicted malfunctions and failures and he

also gave recommendations which assemblies should be paid special

attention.


1. Electrical equipment assemblies which would have deviations

during the test flight:


- transformer TC 375 CO4A;

- three phase bus automatic protector A‡ 3K-50, buses 36D1,

D2, D3;

- panel 024 (sensing deviations)

- panel 025

2. Assemblies related to predicted deviations in the fueling system:

- transfer pump of tank No. 5 on the right wing, electric

centrifugal pump ќЌ-87 (deviation related to voltage drop

of the electric motor, the switch on the panel "15");

- panel of the fueling system on the center pedestal

(controlling the deviations).


Besides a special recommendation was given to check the work of

compass K€13.


The chief specialists of the Aircraft Test Laboratory

compared the results of the test flight recordered in the logbook to

the predictions made by Grabovoi G.P. and made the following

conclusions:


1. the prediction concerning the fueling system and electric

equipment was correct: there were malfunctions of the fueling

and electric systems;


2. the prediction concerning the engines and their units,

oiling system and its units, air system and its units,

hydraulic and hydraulic nitrogen systems and their units,

gear, radio communication installations, cockpit equipment,

airframe, aircraft recorders was fully correct: there were no

cases of malfunction during the test flight.


3. The prediction concerning the emergency situation was also

correct: ther was no emergency situation.


4. The prediction concening the transformer TC 375 CO4A was

correct. Transfer pump of tank No.5 is related to fueling

system, the panel of the fueling system on the center

pedestal sensed deviations.


5. The recommendation to check the work of compass K€-13 was

correct.


Thus the results of the test flight, registered in the

documents of the Aircraft Test Laboratory of the Aircraft Repair

Plant No.243, compared to the predictions of Grabovoi G.P. given for

the period of the test flight 13.11.1991 for the aircraft IL-62 call

sign 86518 are identical.


The predictions of Grabovoi G.P. based on his extra sensory

perception were correct for the aircraft inspected by him before the

test flight.


The executor of the work The representatives of the Customer:

Grabovoi G.P.

Kubrak V.N. Chief of the Aircraft

Test Laboratory of the Aircraft Repair

Plant No.243


Saulkin V.M. The Chief of

Engineering Information Center of the

Aircraft Maintenance Base of the

National Airline "Uzbekistan Airways"


Saldin G.N. Chief engineer of the

Aircraft Test Laboratory of the

Aircraft Repair Plant No.243


Nemtsov S.V. Chief engineer of

Engineering Information Center of

the Aircraft Maintenance Base of the

National Airline "Uzbekistan Airways"





APPROVED APPROVED

Director General Deputy Director General

of the joint venture of the National Airline of

"ASKON" the Republic of Uzbekistan


I.V. Khamrakulov S.M. Sumbaev

3 July 1992 3 July 1992



R E P O R T N 17/92


on extrasensory works on extrasensory prediction

of aviation accidents occurance in February - March

of 1992 carried out by Grigoriy Petrovich Grabovoy



We, the undersigned, the executor of the work the extrasense

G.P.Grabovoy and representatives of the Customer: a head of the

engineering and information centre of the aviation and technical

base of the National Airline of the Republic of Uzbekistan V.M.

Saulkin and the senior project engineer of the engineering

information centre of the aviation and technical base of the

National Airline of the Republic of Uzbekistan S.V.Nemtzov, drew up

the present report that G.P.Grabovoy carried out the undermentioned

extrasensory works on the agreement N 9 of 02.12.91 between the

joint Soviet American enterprise "ASKON" and the Uzbek Department of

Civil Aviation on the subject "Non-traditional methods of aviation

tecnique diagnostics".


In February and March of 1992 the extrasense G.P.Grabovoy,

according to the situation classification on examination of aviation

accidents and incidents with civil air ships (PRAPI-88) made his

extrasensory predictions of aviation accidents occurence for all

base aircrafts of the Tashkent aviation and technical base.

The aim of this work was to predict possible aviation accidents

for their timely prevention. using extrasensory methods.

Prediction data by G.P.Grabovoy and real events are given in

the table 1:


Table 1

____________________________________________________________________

Term period : Extrasensory informa- : Real information

of the work : tion of the predction :

: by the G.P.Grabovoy : (Facts)

____________________________________________________________________


20.02.92 No aviation accidents No aviation accidents

12.00


21.02.92

12.00


21.02.92 No aviation accidents No aviation accidents

12.00


22.02.92

12.00



Sheet N 2 Report N 17/92



24.02.92 No aviation accidents No aviation accidents

12.00


02.03.92

12.00


05.03.92 No aviation accidents No aviation accidents

12.00


14.03.92

12.00


15.03.92 No aviation accidents No aviation accidents

12.00


21.03.92

12.00


_____________________________________________________________________


As it can be seen from the table all extrasensory predictions

by G.P.Grabovoy were fully confirmed.


Executor of works Representatives of the Customer:

G.P.Grabovoy

Head of engineering and information

centre of aviation technical

base of National Airlines of the

Republic of Uzbekistan

__________________ V.M.Saulkin


Senior project engineer of engine-

ering and information centre of

aviation and technical base of the

National Airline of the Republic

of Uzbekistan

__________________ S.V.Nemtzov




APPROVED APPROVED

Director General Deputy Director General

of the joint venture of the National Airline of

"ASKON" the Republic of Uzbekistan


I.V. Khamrakulov S.M. Sumbaev

3 July 1992 4 July 1992





R E P O R T N 18/92


on extrasensory works on extrasensory predication

of failures, faults and deviations from operation

specificatitons on the aircraft IL-62M side number

86492 during the test flight, carried out by

Grigoriy Petrovich Grabovoy on 16 June 1992



We, the undersigned, the executor of works the extrasense G.P.

Grabodoy and the representatives of the Customer: the head of the

flight-test station of the plant N 243 of the Civil Aviation

V.N.Kubrak, senior project engineer of the flight-test station of

the plant 243 of the Civil Aviation G.N.Saldin and the head of the

engineering and information centre of the aviation and technical

base of the National Airline of the Republic of Uzbekistan V.M.

Saulkin, drew up the present report that G.P.Grabovoy in June 1992

carried out the undermentioned mentioned extrasensory works on the

agreement N 9 of 02.12.1991 between the joint Soviet-American

enterprise "ASKON" and the Uzbek Department on Civil Aviation on the

subject "Non-traditional methods of aviation technique diagnostics".


The senior project engineer G.N.Saldin set a task to the

extrasense G.P.Grabovoy to diagnose failures, faults and devia-

tions from specifications on the aircraft IL-62M side number 86486

during the test flight on the following points:


1. To make the prediction on engines.

2. To make the prediction on the work of automated control of

SAU 1T-2.

3. To make the prediction on the work of measuring part of

SPUT-8V with the predictions of the following devices,

determining the working capacity of the fuel gauge: DK11-2T,

DTC20-1, DT40-3, DT40-2, DT40-1, DT40, DTC20, VI26-1,

VI27-2, UT32-3T 826-1, UT32-3T 0828-1, 2PPT26-3T, BU10V-1,

DK11-3T, DTC20-3, DT40-5, DT40-4, DTC20-2, DT40-7, DTC20-4,

DT40-6, VI26-2, UT32-1T, PPT26-1T, UT32-2T, 2PPT26-1T

0845-01, UT32-1T, PPT26-1T, DTC20-5, DTC20-6, DK11-1T,

DTC20-6, VI26-2, DT40-6, DTC20-4, DT40-7, VI03-2, PGA3K-1T,

DK11-3T, DTC20-3, DT40-5, DT40-4, DTC20-2, 2PPT25-2TT,

UT32-3T, UT32-2T, DTC20-1, DT40-3, DT40-2, DT40-1, DT40,

DTC20.

4. To make prediction on work of the following fuel pumps of

fuel transfer of auxiliary tanks: 7-4121, 7-4501, 6-4125,

6-4126, 6-4508, 7-4122, 7-4592.

5. To make the predication on the work of the following pumps

of fuel transfer to consumption section: 7-4141, 6-4143,

6-4147, 6-4144, 6-4148, 7-4142, 7-4146, 7-4145.



Sheet N 2 Report N 18/92


6. To make the prediction on the work of the following pumps of

fuel pumping: 7-4169, 7-4165, 6-4171, 6-4167, 6-4172,

7-4166, 7-4170.

7. To make the prediction on fault of the following lamps:

15-4539, 4541/16, 15-4092, 4540/15, 15-4536, 15-4359,

15-4361, 15-4365, 15-4352, 15-4366, 15-4360, 15-4364,

15-4363, 15-4437, 15-4279, 15-4439, 15-4281, 15-4222,

15-4440, 15-4280, 15-4438.


8. To make the prediction on the following points:

- fuel system;

- fuel system units;

- oil system and it's units;

- fuselage;

- wing;

- vertical tail;

- system of elevations and it's units;

- rudder, flap, power plant etc and their units control;

- hydraulic and hydronitrogen system and it's units;

- radiocommunication equipment;

- navigation enquipment;

- radar equipment;

- instrumental equipment;

- electrical equipment;

- undercarriage, including wheels;

- flight recorders;

- aviation incident.

9. To make the prediction on fuel pump signalization failure.


The work was carried out by G.P.Grabovoy on 16.06.1992 on

devices schemes with the data, got with the help of clairvoyance.

The purpose of the work by G.P.Grabodvoy was to diagnose the

aircraft in a flight in contrast to the analogous work for the

aircraft on the ground before the test flight, carried out by

G.P.Grabovoy in March, 14, 1992 to confirm the result, got

13.11.1991.

The results of the work by G.P.Grabovoy on the prediction of

the technical state of the aircraft IL-62M side number 86492 are set

down in accordance with abovementioned items of the task.

Confirmations of the predictions were based on information, set down

in the log on the test flight of the aircraft IL-62M side number

86492 of 16.06.1992.

The predictions were transfered on 16.06.1992 during the test

flight of the aircraft side number 86492 25 a minute before the

aircraft landing.


1. Information of the prediction on engines: deviations in the

work of the signalization, related to the engine N 4.

Confirmation, recording in the log - The indicator lighted up

three times in half heat "Fault in the engine selection N 4".

2. Information of the prediction on SAU 1T-2: Deviation in the

work of SAU 1T-2 at the go-around.

Confirmation recording in the log - SAU 1T-2 periodically went

on pitching at the go-around.

3. Information by G.P.Grabovoy on the work of fuel device and

confirmation of his information are given in the table 1.



Sheet N 3 Report N 18/92

Table 1

________________________________________________________________

Information on the prediction : Confirmation

by G.P.Grabovoy :

________________________________________________________________

DK11-2T no faults confirmed

DTC20-1 no faults confirmed

DT40-3 no faults confirmed

DT40-2 no faults confirmed

DT40-1 no faults confirmed

DT40 no faults confirmed

DTC20 no faults confirmed

BI27-1 no faults confirmed

BI27-2 no faults confirmed

UT32-3T 826-1 no faults confirmed

UT32-3T 0828-1 no faults confirmed

2PPT26-3T no faults confirmed

BU10V-1 no faults confirmed

DK11-3T no faults confirmed

DTC20-3 no faults confirmed

DT40-5 no faults confirmed

DT40-4 no faults confirmed

DTC20-2 no faults confirmed

DT40-7 no faults confirmed

DTC-20-4 no faults confirmed

DT40-6 no faults confirmed

BI26-2 no faults confirmed

UT32-1T no faults confirmed

PPT26-1T no faults confirmed

UT32-2T no faults confirmed

2PPT26-1T 0845-01 no faults confirmed

UT32-1T no faults confirmed

PPT26-1T no faults confirmed

DTC20-5 no faults confirmed

DTC2-6 no faults confirmed

DK11-1T no faults confirmed

DTC20-6 no faults confirmed

BI26-2 no faults confirmed

DT40-6 no faults confirmed

DTC20-4 no faults confirmed

DT40-7 no faults confirmed

BIO3-2 no faults confirmed

PGA3K-1T no faults confirmed

DK11-3T no faults confirmed

DTC20-3 no faults confirmed

DT40-5 no faults confirmed

DT40-4 no faults confirmed

DTC20-2 no faults confirmed

2PPT25-2TT no faults confirmed

UT32-3T no faults confirmed

UT32-2T no faults confirmed

DTC20-1 no faults confirmed

DT40-3 no faults confirmed

DT40-2 no faults confirmed

DT40-1 no faults confirmed

DT40 no faults confirmed

DTC20 no faults confirmed

________________________________________________________________


4. Information on the prediction on the work of transfer pumps

of auxiliary tanks and the confirmation is given in the Table 2.



Sheet N 4 Report N 18/92


Table 2

________________________________________________________________

Information on the prediction : Confirmation

by G.P.Grabovoy :

________________________________________________________________

7-4121 no faults confirmed

7-4501 no faults confirmed

6-4125 no faults confirmed

6-4126 no faults confirmed

6-4508 no faults confirmed

7-4122 no faults confirmed

7-4592 no faults confirmed

________________________________________________________________

5. The prediction on the work of the following pumps of fuel

transfer to the consumption sections and corresponding confirmation

is given in the Table 3.

Table 3

________________________________________________________________

Information on the prediction : Confirmation

by G.P.Grabovoy :

________________________________________________________________

7-4141 no faults confirmed

6-4143 no faults confirmed

6-4147 no faults confirmed

6-4144 no faults confirmed

6-4148 no faults confirmed

7-4142 no faults confirmed

7-4146 no faults confirmed

7-4145 no faults confirmed

________________________________________________________________

6. Information on the prediction on the work of fuel pumping

and confirmation are given in the table 4.

Table 4

________________________________________________________________

Information on the prediction : Confirmation

by G.P.Grabovoy :

________________________________________________________________

7-4169 no faults confirmed

7-4165 no faults confirmed

6-4171 no faults confirmed

6-4167 no faults confirmed

6-4172 no faults confirmed

7-4160 no faults confirmed

7-4570 no faults confirmed

________________________________________________________________

7. Information on the prediction on the works of lamps and

confirmation is given in the Table 5.

Table 5

________________________________________________________________

Information on the prediction : Confirmation

by G.P.Grabovoy :

________________________________________________________________

15-4539 no faults confirmed

4541/16 no faults confirmed

15-4092 no faults confirmed

4540/15 no faults confirmed

15-4536 no faults confirmed

15-4359 no faults confirmed

15-4361 no faults confirmed

15-4365 no faults confirmed



Sheet N 5 Report N 18/92


15-4352 no faults confirmed

15-4366 no faults confirmed

15-4360 no faults confirmed

15-4364 no faults confirmed

15-4363 no faults confirmed

15-4437 no faults confirmed

15-4279 no faults confirmed

15-4439 no faults confirmed

15-4281 no faults confirmed

15-4222 no faults confirmed

15-4440 no faults confirmed

15-4280 no faults confirmed

________________________________________________________________

8. Prediction by G.P.Grabovoy on failures and faults or defects

in aircraft system and design as well as confirmation is given below

in the Table 6.

Table 6

________________________________________________________________

Information on the prediction : Confirmation and regis-

by G.P.Grabovoy on the air- : tration in the log

craft systems and design :

________________________________________________________________

In the fuel system and units: Confirmed

"Pipe in the right side of the "Jets of transfer of the 5

wing has increased resistance to right tank shall be checked

fuel transfer. The jet diameter (transfer is late)"

is below the standard"


No faults in the oil system and Confirmed

units


No defects in the fuselage Confirmed


No defects in the wing Confirmed


No defects in the tail Confirmed


Elevation system and units - Confirmed

no faults


Aircraft control system: Confirmed

Deviation in the aircraft "RM with witching APM-62

control system: shall be repaired (deviated

to the left)"

Hydraulic and hydronitrogen Confirmed

system and units - no faults


Radiocommunication equipment - Confirmed

no faults


Navigation equipment - Confirmed

no faults


Radar equipment - Confirmed

Deviation in the work of "Pointing array incorrect,

radar equipment declined to the right"


Instrumentation Confirmed

Deviation in the instrumen- "Fault in UUT (pitching

tation work indicator)"



Sheet N 6 Report N 18/92



Electrical equipment - Confirmed

Deviation in the work of "Repair of an amplifier

electrical equipment AP-309"


Undercarriage (including Confirmed

wheels) - no faults


Flight recorders - Confirmed

no faults


Aviation incident - Confirmed

no faults

_________________________________________________________________

9. The prediction on signalization failure of fuel pumps:

deviation in transfer from 5 right tank.

The confirmation is the registration in the log:

To check the transfer jets from the right 5 tank (the transfer

is late).

Thus all extrasensory information by G.P.Grabovoy on the

aircraft N 86492 was fully confirmed and the following conclusions

can be made: there is no differences between the efficiency of the

extrasensory diagnostics by G.P.Grabovoy of the aircraft both in a

flight or ground, the information by G.P.Grabovoy is fully confirmed

in any case. It makes sense to use the extrasensory diagnostics by

G.P.Grabovoy in the future to increase the flights safety and timely

detection of defects on ground.




Executor of works Representatives of the Customer:

G.P.Grabovoy

Head of the flight-testing station

of the plant N 243 of Civil Aviation


V.N.Kubrak



Senior project engineer of the

flight testing station of the

plant N 243 of Civil Aviation


G.N.Saldin



Head of engineering and information

centre of aviation technical base of

National Airlines of the Republic of

Uzbekistan

V.M.Saulkin



APPROVED APPROVED

Director of the State Deputy Director General

Introduction scientific of the National Airline of

and production enterprise the Republic of Uzbekistan

"Progress"

A.V. Zaitzev S.M. Sumbaev

18 September 1992 18 September 1992





R E P O R T N 33/92


on extrasensory works on extrasensory prediction of

aviation accidents by photographs a month before

in the third quarter 1992 carried out

by Grigoriy Petrovich Grabovoy



We, the undersigned, the executor of works the extrasense

G.P.Grabovoy and representatives of the Customer: a head of

engineering and information centre of aviation and technical base of

the National Airline of the Republic of Uzbekistan V.M.Saulkin, a

head of the base test-repair metrological laboratory of Aviation and

technical base of the National Airline of the Republic of Uzbekistan

A.V.Shatilov, a senior project engineer of engineering and

information centre of aviation and technical base of National

Airline of the Republic of Uzbekistan S.V.Nemtzov drew up the

present report that G.P.Grabovoy carried out undermentioned

extrasensory works on the agreement N 14/92 of 04. 07.92 on the

subject "Non-traditional methods of diagnostics of aviation

technique" between the State introduction scientific and production

enterprise "PROGRESS" and the National Airline of the Republic of

Uzbekistan "Uzbekistan Khavo Yullari".

In the third quarter 1992 G.P.Grabovoy carried out the work on

the agreement N 14/92 of 04.07.1992 at the Tashkent aviation and

technical base.

The purpose of the work was the determination of failure which

could threaten the flights safety.

On the subitem 1. "Diagnostics of the aviation equipment of the

Tashkent airport by photographs" of the work schedule.

On the subitem 1.1. "Prediction of AP for definite period"

G.P.Grabovoy carried out the prediction of aviation accidents

prediction for all base park of aircrafts of the Tashkent aviation

and technical base.

The extrasensory diagnostic of the aviation equipment was

carried out on aircrafts photographs where the side number could be

seen. The predication was given for one month.

For the period from 16.06.1992-17.07.1992 the prediction by

G.P.Grabovoy: no aviation accidents.

For the period from 17.07.1992 - 17.08.1992 by G.P.Grabovoy: no

aviation accidents.

For the period from 17.08.1992 - 17.09.1992 by G.P.Grabovoy: no

aviation accidents.

Information by G.P.Grabovoy was fully confirmed from 16.06.

1992 - 17.09.1992 - aviation accidents didn't take place.

The extrasensory prediction by G.P.Grabovoy by photographs was

confirmed for all 63 aircrafts the photographs of which were

available.



Sheet N 2 Report N 33/92


Thus all extrasensory information by G.P.Grabovoy prediction of

aviation incidints occurence by photographs a month before, was

fully confirmed.



Executor of works Representatives of the Customer:

G.P.Grabovoy


Head of engineering and information

centre of aviation technical base

of National Airlines of the

Republic of Uzbekistan


V.M.Saulkin



Senior project engineer of engineering

and information centre of aviation

technical base of the National Airline

of the Republic of Uzbekistan


S.V.Nemtzov



Head of the base test-repair

metrological laboratory of aviation

technical base of the National Airline

of the Republic of Uzbekistan


A.V.Shatilov



APPROVED APPROVED

Director of the State Deputy Director General

Introduction scientific of the National Airline of

and production enterprise the Republic of Uzbekistan

"Progress"

A.V.Zaitzev S.M. Sumbaev

18 September 1992 18 September 1992





R E P O R T N 34/92


on extrasensory works on extrasensory prediction a month

before of aviation accidents occurence carried out

by Grigoriy Petrovich Grabovoy

in the third quarter of 1992



We, the undersigned, the executor of works the extrasense

G.P.Grabovoy and representatives of the Customer: a head of

engineering and information centre of aviation and technical base of

the National Airline of the Republic of Uzbekistan V.M.Saulkin, a

head of the base test-repair metrological laboratory of Aviation and

technical base of the National Airline of the Republic of Uzbekistan

A.V.Shatilov, a senior project engineer of engineering and

information centre of aviation and technical base of National

Airline of the Republic of Uzbekistan S.V.Nemtzov drew up the

present report that G.P.Grabovoy carried out undermentioned

extrasensory works on the agreement N 14/92 of 04. 07.92 on the

subject "Non-traditional methods of diagnostics of aviation

technique" between the State introduction scientific and production

enterprise "PROGRESS" and the National Airline of the Republic of

Uzbekistan "Uzbekistan Khavo Yullari".

In the third quarter of 1992 G.P.Grabovoy carried out the work

on the agreement N 14/92 of 04.07.1992 at the Tashkent aviation and

technical base.

The purpose of the work was to determine those failure, which

could threaten the flights safety in the future.

On subitem 1.1. "The prediction of aviation accidents for the

definite period" G.P.Grabovoy has carried the extrasensory

prediction of aviation accidents occurence for the base aircrafts of

the Tashkent aviation and technical base.

The extrasensory diagnostics of the aviation technique was

carried out using aircrafts' photographs where the side number could

be seen. The prediction was given for the monthly period.

For the period from 16.06.1992-17.07.1992 the prediction by

G.P.Grabovoy was: accidents will not take place.

For the period from 17.07.1992 - 17.08.1992 the prediction by

G.P.Grabovoy was: accidents will not take place.

For the period from 17.08.1992 - 17.09.1992 the prediction by

G.P.Grabovoy - accidents will not take place.

The extrasensory information of the prediction by G.P.Grabovoy

coinsides with the realtly, there were no accidents from 16.06.1992

-17.09.1992.

Thus all extrasensory information by G.P.Grabovoy got during

his work on the extrasensory prediction a month before the aviation

accidents occurence was fully confirmed.



Sheet N 2 Report N 34/92



Executor of works Representatives of the Customer:

G.P.Grabovoy


Head of engineering and information

centre of aviation technical base

of National Airlines of the

Republic of Uzbekistan


V.M.Saulkin



Senior project engineer of engineering

and information centre of aviation

technical base of the National Airline

of the Republic of Uzbekistan


S.V.Nemtzov



Head of the base test-repair

metrological laboratory of aviation

technical base of the National Airline

of the Republic of Uzbekistan


A.V.Shatilov